Generation1,247 MW
Load1,183 MW
Reserve64 MW
Frequency50.02 Hz
Renewable %34%
Imports0 MW
Losses2.1%
CO2 Rate0.42 t/MWh
Grid Topology
Solar Farm
225 MW
Wind Farm
198 MW
Gas Plant
524 MW
Coal Plant
300 MW
Transmission Bus 132kV
1,247 MW Total
Substation N
312 MW
Substation E
287 MW
Substation S
341 MW
Substation W
243 MW
Node Detail
Generation vs Demand
Solar Farm
Capacity
400 MW
Output
225 MW
Availability
56%
Efficiency
21%
Wind Farm
Capacity
350 MW
Output
198 MW
Availability
57%
Efficiency
38%
Gas Plant
Capacity
600 MW
Output
524 MW
Availability
87%
Efficiency
52%
Coal Plant
Capacity
500 MW
Output
300 MW
Availability
60%
Efficiency
34%
Generator Detail
Energy Mix
Merit Order Stack
Total Load
1,183 MW
Normal Zones
4
Curtailed Zones
1
Shed Zones
1
Zone APriority 1
Load
312 MW
Capacity
400 MW
Zone BPriority 2
Load
287 MW
Capacity
350 MW
Zone CPriority 3
Load
204 MW
Capacity
350 MW
Zone DPriority 4
Load
243 MW
Capacity
300 MW
Zone EPriority 5
Load
98 MW
Capacity
200 MW
Zone FPriority 6
Load
0 MW
Capacity
150 MW
Demand Forecast (24h Ahead)
Load Shedding Sequence
| Stage | Zones | Load Shed | Status | Action |
|---|---|---|---|---|
| Stage 1 | F | 150 MW | Active | |
| Stage 2 | E, F | 348 MW | Ready | |
| Stage 3 | D, E, F | 591 MW | Ready | |
| Stage 4 | C, D, E, F | 795 MW | Ready |
Critical: 3
Warning: 5
Info: 12
| Timestamp | RTU | Tag | Description | Priority | State | Value | Limit | Action |
|---|