Home/Plant A/Treatment Train 1
--:--:--
Notifications
P-103 high vibration alarm triggered
2 min ago
Filter 3 differential pressure rising
18 min ago
Daily backup completed successfully
1 hr ago
JD
J. Davis
Intake Flow
2,847
m³/h
04,000
pH Level
7.21
pH
6.09.0
Turbidity
0.31
NTU
02.0
Free Chlorine
1.82
mg/L
03.0
Water Temp
18.4
°C
040
Dissolved O2
8.7
mg/L
015
Head Pressure
4.2
bar
07.5
Output Flow
2,830
m³/h
04,000
Process Flow — Treatment Train 1
Intake
2,847 m³/h
Coagulation
pH 7.21
Sediment.
0.82 NTU
Filtration
0.31 NTU
Disinfect.
1.82 mg/L
Distrib.
2,830 m³/h
Active Alarm Summary
CRITP-103 high vibration — 12.4 mm/s14:23
CRITChlorine residual low at point D-714:18
WARNFilter 3 delta-P approaching limit13:52
INFOBackwash cycle completed on Filter 113:30
Alarm Log
TimeTagDescriptionPriStateValueSetpointAction
Pumps
Valves
PLC: 192.168.1.100Scan Rate: 500msLast Update: --:--:--Tags: 847/847WaterSCADA v3.2.1